Yahoo Malaysia Web Search

Search results

  1. 18 hours ago · Terminal 1 is the first terminal built and was opened in 1985. It is located on the southern side of the airport, opposite Terminal 2. Terminal 1 has 3 sub-terminals, each equipped with 25 check-in counters, 23 aerobridges, 5 baggage carousels, and 7 gates. It has the capacity to handle 9 million passengers per annum.

  2. 18 hours ago · Track Thai Lion (SL) #938 flight from Don Muang Int'l (Old Bangkok Int'l) to Nanchang Changbei Int'l Flight status, tracking, and historical data for Thai Lion 938 (SL938/TLM938) 06-Jul-2024 (DMK / VTBD-KHN / ZSCN) including scheduled, estimated, and actual departure and arrival times.