Yahoo Malaysia Web Search

Search results

  1. 12 hours ago · Flight status, tracking, and historical data for EVA Air 117 (BR117/EVA117) 06-Jul-2024 (SDJ / RJSS-TPE / RCTP) including scheduled, estimated, and actual departure and arrival times.

  2. 12 hours ago · Terminal 1 is the first terminal built and was opened in 1985. It is located on the southern side of the airport, opposite Terminal 2. Terminal 1 has 3 sub-terminals, each equipped with 25 check-in counters, 23 aerobridges, 5 baggage carousels, and 7 gates. It has the capacity to handle 9 million passengers per annum.