  1. The Hulu Terengganu Hydroelectric Project is an underground hydroelectric power plant located the Terengganu, Malaysia. It was built from 2010 to 2015 by Tenaga Nasional Berhad, the largest electricity utility company in Malaysia.

  2. May 31, 2024 · Hulu Terengganu is a 265MW hydro power project. It is located on Puah river/basin in Terengganu, Malaysia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active.

  3. Hulu Terengganu was the first major hydro scheme in Peninsular Malaysia to be developed following the enactment of the Environmental Quality Act, 1974. A sustainable development plan was thus formulated to address current legal requirements, as well as to mitigate impacts which could have been caused by the scheme.

  4. Dec 10, 2021 · Hulu Terengganu is a 265MW hydro power project. It is located on Puah river/basin in Terengganu, Malaysia. The project is currently active. It has been developed in multiple phases.

  5. Dec 17, 2010 · Tenaga Nasional Bhd (TNB) has inked three agreements worth RM991.8mil for the Hulu Terengganu hydroelectric project involving the construction of two dams and the installation of two hydro turbines and generators in an underground power station with a total installed capacity of 250MW.

  6. Hulu Terengganu Hydroelectric Project (HTHP) involved the construction of two new dams which led to the creation of Puah Reservoir with 60 km 2 surface areas and Tembat Reservoir (1.3 km 2 ).

  7. Nov 21, 2019 · Puah Dam is part of Hulu Terengganu Hydroelectric Project (HTHEP) and located at upstream of the existing Kenyir Reservoir in the State of Terengganu. Puah reservoir has a catchment area of 410 km 2. The average annual energy output from the Puah Power Scheme (2 × 125 MW) has been estimated as of 412 GWh/annum [ 1 ].

  8. Mar 25, 2016 · Hulu Terengganu Hydroelectric Project Malaysia is located at Tasik Kenyir reservoir, Terengganu, Malaysia. Location coordinates are: Latitude= 5.1545, Longitude= 102.6054. This infrastructure is of TYPE Hydro Power Plant with a design capacity of 250 MWe.

  9. The HULU TERENGGANU HYDROELECTRIC PROJECT is developed by Tenaga Nasional Berhad and the main civil work (Lot CW2 Works) was awarded to Loh & Loh – Sinohydro Joint Venture. The project commenced on 20 May 2011 and completed on schedule on 18 December 2015, a contract period of 1674 days.

  10. Abstract. Puah Dam, is an earth-fill dam and become one of essential struc-tural part under Hulu Terengganu Hydroelectric Project (HTHEP). Other structural parts that contributing for HTHEP are Underground Powerhouse, Tunnels, Tailrace Outlet, Power Intake, Spillway, associated buildings and access roads.