Yahoo Malaysia Web Search

Search results

  1. Tenaga Nasional Berhad

  2. TION FOR LOAD UP TO 100A 1.2.1 PurposeThe application for the supply of electricity with load up to 100A which is for a single (1) phase and three (3) p. e Steps Involved To Get Your ElectricityThe following steps are required to get the supply of electricity up to 100A for a single (1) phas. Steps. Action.

  3. TNB highly recommends that the supply feed to the installation LPC adopt the criteria for duplicated in-feed to enhance supply security and reliability to the interconnection.

  4. For H.V. supply, TNB normally requires only a H.V. switch room to house their switchgears. Adjacent to TNB switch room, the DE is required to provide H.V. switch room(s), transformer room(s), L.V. switch rooms and standby generator set room.

  5. System performance for Distribution Network (TNB DN) been monitored in term of SAIDI, SAIFI and CAIDI indexes. Starting from 2018, Financial Year (FY) for TNB DN is considered from January to December. Interim FY is introduced to measure performance of 4 months transition period (Sept 17 to Dec 17).

  6. Kedai Tenaga is TNBs Service and Advisory Centre which are located throughout Peninsular Malaysia. Complete information on Kedai Tenaga throughout Peninsular Malaysia can be obtained via TNB website (www.tnb.com.my). This list is subject to changes and may be reviewed from time to time.

  7. For General Enquiries, Please Contact TNB CareLine via Facebook @TNBCareline or Call 1-300-88-5454; Weekdays: 8.00 AM - 7.00 PM; Weekend & Public holiday: 8.00 AM - 5.00 PM; Email us at tnbcareline@tnb.com.my